service hub

Bathroom Remodeling in NYC

Master baths, walk-in showers, half-baths, and accessible builds. Premium tile and stone, smart-bath integration, licensed plumbing. 4–10 weeks.

Bathroom Remodeling in NYC

Bathroom remodeling in NYC and northern New Jersey, delivered by a Newark-based design-build firm with 10+ years on residential bathrooms. Master baths, walk-in showers, half-baths, accessible builds, smart-bath integrations, and partial remodels — all under one project lead, all with the same waterproofing and plumbing standards regardless of finish tier.

[License #] · 2-year workmanship warranty · 5.0 ★ Google · Licensed, Insured & Bonded · 10+ years.

Schedule a free consultation — in person or by video. Call (862) 430-3655.

What we build

Bathrooms are the project type we run most often. The scope ranges from a single vanity replacement to a full primary suite with custom slab work, smart-bath wiring, heated floors, and a curbless walk-in shower. Whatever the scope, three things stay constant: the waterproofing membrane, the plumbing rough-in standards, and the tile-set quality. The size of the project changes how long it takes; it doesn’t change how it gets built.

Bathroom services we offer

Master bathroom remodels

Full master suites with double vanities, walk-in showers, freestanding tubs, separate water closets, and custom storage built into the wall framing. Slab stone vanities, bookmatched shower walls, mitred outside corners, and heated floors are standard upgrade paths. Most master baths run 6 to 10 weeks.

Walk-in showers and wet rooms

Curbless walk-in showers with linear drains. Frameless glass enclosures. Wet-room builds that combine the shower and tub area into a single waterproofed zone. Sub-floor recessing for level finishes. Built-in benches, recessed niches, and dual shower heads coordinated with the plumbing rough-in.

Smart bathrooms

Heated floor systems (electric or hydronic), app-controlled shower valves, pre-wired smart mirrors, integrated audio, automatic-flush toilets, and motion-sensor niche lighting. Smart features are roughed in during framing — never bolted on after the tile is set.

Half-baths and powder rooms

Compact, high-impact builds. Statement vanities, hand-laid mosaic feature walls, sconce lighting, and the kind of fixtures you don’t put in a kid’s bathroom. Half-baths often run 3 to 5 weeks.

Accessible bathrooms

Roll-in showers, grab bars set into solid blocking, comfort-height toilets, ADA-compliant clearances, and lever-handled fixtures. We coordinate with occupational therapists and aging-in-place specialists when the homeowner needs the build certified for caregiver coverage.

Partial bathroom remodels

Vanity-only, shower-only, tile-only, and fixture-only jobs. Smallest scope we run well, not a dollar threshold. Many homeowners come to us for a partial remodel and ask us back six months later for the rest.

How a bathroom remodel runs

Four steps, same as every project.

  1. Free consultation. On site or by video. We measure, photograph, and walk through scope. Same-day response on most inquiries.
  2. Design and written line-item proposal. Drawings, finish selections in three tiers, and a quote where every line is itemized.
  3. Build. Floor protection in place before tools arrive. Dust barriers up before demo. In-house tile and stone setters; trusted licensed plumbers — long-term partners we’ve worked with for years. Daily clean-down. One project lead, one phone number.
  4. Walk-through and warranty. Punch list, deep clean, and the 2-year written workmanship warranty plus pass-through manufacturer warranties.

The full process →

Service areas

We work from Newark across the NYC metro on every bathroom build:

For bathroom projects specifically in Manhattan or Jersey City, see our combo pages: Bathroom remodeling in Manhattan and Bathroom remodeling in Jersey City.

  • Walk-in shower with bookmatched marble, Manhattan. Curbless walk-in shower, bookmatched calacatta slab walls, mitred outside corners, linear drain, heated floor. 7 weeks.
  • Master bath with slab vanity and smart-bath, Brooklyn. Double slab vanity, app-controlled shower valves, pre-wired smart mirrors, integrated audio, heated floor. 8 weeks.
  • Half-bath with mosaic feature wall, Jersey City. Hand-laid glass mosaic feature wall, statement vanity, sconce lighting, custom mirror frame. 4 weeks.

See more in the portfolio →

Why homeowners choose LM Pro for bathrooms

  • In-house tile and stone setters. Tile and marble are our core trade — done by our own crew, not subbed.
  • Trusted licensed plumbers — long-term partners we’ve worked with for years. Plumbing is the trade most likely to fail at the 6-to-12-month mark; long-term plumbing partners are why we don’t get callbacks at month seven.
  • Smart-bath capability built in from rough-in. Wiring planned during framing, not retrofitted after tile.
  • Material flexibility. Calacatta and Carrara slab on the high end. Slab quartz, large-format porcelain, and durable mid-range tile when the budget calls for it. Your brief, not ours.
  • Partial remodels welcome. Vanity-only, shower-only, tile-only — same standards as a full primary suite.
  • Bond and insurance. Licensed and insured across NY and NJ. Bonded for NJ work specifically (NY work runs under separate coverage).

Frequently asked questions

How long does a bathroom remodel take in NYC?

A standard single bathroom remodel runs 4 to 8 weeks from demolition to final walk-through. Master baths with custom slab work, mitred tile, smart-bath integration, or co-op alteration agreement requirements run 6 to 10 weeks. Buildings with restrictive work hours — many Manhattan co-ops only allow construction 9 AM to 4 PM weekdays — typically add a week or two on top.

What does a bathroom remodel in NYC cost?

Cost depends on scope, finish tier, and building constraints. Single-element work (vanity-only, shower-only, tile re-do) is the lowest-cost path. A full master bath with slab stone, custom tile, smart-bath features, and DOB-permitted plumbing is the high end. We give you three finish-tier price options on every quote — high-end, mid-range, and budget-conscious — so you see the full spread before signing. The consultation and the written quote are free.

Can you remodel just part of a bathroom — vanity-only, shower-only, or tile-only?

Yes. Partial bathroom remodels are some of our most common projects. Vanity replacements, shower-only renovations, full re-tile of an existing layout, and accessible-grab-bar retrofits are all fair scope. The minimum project size is the smallest job we can do well — not a dollar threshold.

Do you build smart bathrooms?

Yes. Heated floor systems, app-controlled shower valves, pre-wired smart mirrors, automatic-flush toilets, recessed motion-sensor niches, and integrated audio. The wiring and rough-in for smart-bath features happen during framing and plumbing — adding it after the tile is set is expensive and rarely clean. We plan it in from the start of the design phase.

What waterproofing system do you use under the tile?

Schluter or RedGard membrane on every wet wall and shower floor. Pan slope is verified before tile goes down. Linear drains, point drains, and curbless showers all use the same waterproofing standard — we don't shortcut waterproofing by tier. The membrane is the single most important detail in a bathroom remodel because every other failure traces back to it.

Do you do walk-in showers and curbless showers?

Yes — both are standard. Curbless walk-in showers require sub-floor recessing or a build-up of the surrounding floor, which we plan for during demo. Linear drains, point drains, and trough drains are all in scope. We also build accessible showers with grab bars, fold-down benches, and ADA-compliant clearances.

Do you handle DOB permits for bathroom plumbing changes?

Yes. NYC's Department of Buildings requires a permit for plumbing relocations, fixture additions, and any work that changes the bathroom's footprint. We file under our license and manage the inspections. Cosmetic-only work in the same footprint (tile replacement, vanity swap, fixture replacement) usually doesn't require a permit — we'll tell you on the consultation which path your project falls under.

Can I bring my own tile, fixtures, or vanity?

Yes. If you've already sourced materials — a slab held at a yard, fixtures imported from overseas, a tile you've been holding for two years — we'll install them. We add a clarifying note to the contract about which warranties apply to homeowner-supplied materials. Some manufacturers void warranties on pieces not installed by an authorized installer; we flag those before you commit.

Reviews

5.0 ★ on Google. 5.0 ★ on Yelp. Most of the reviews on the reviews page reference bathroom builds specifically — tile work, plumbing, smart-bath wiring, and on-time delivery.

Ready to start your bathroom?

Call (862) 430-3655 or schedule a free consultation — by video if you can’t be on site, in person if you can. Written quote back in a few business days.

FAQs

Common questions

How long does a bathroom remodel take in NYC?

A standard single bathroom remodel runs 4 to 8 weeks from demolition to final walk-through. Master baths with custom slab work, mitred tile, smart-bath integration, or co-op alteration agreement requirements run 6 to 10 weeks. Buildings with restrictive work hours — many Manhattan co-ops only allow construction 9 AM to 4 PM weekdays — typically add a week or two on top.

What does a bathroom remodel in NYC cost?

Cost depends on scope, finish tier, and building constraints. Single-element work (vanity-only, shower-only, tile re-do) is the lowest-cost path. A full master bath with slab stone, custom tile, smart-bath features, and DOB-permitted plumbing is the high end. We give you three finish-tier price options on every quote — high-end, mid-range, and budget-conscious — so you see the full spread before signing. The consultation and the written quote are free.

Can you remodel just part of a bathroom — vanity-only, shower-only, or tile-only?

Yes. Partial bathroom remodels are some of our most common projects. Vanity replacements, shower-only renovations, full re-tile of an existing layout, and accessible-grab-bar retrofits are all fair scope. The minimum project size is the smallest job we can do well — not a dollar threshold.

Do you build smart bathrooms?

Yes. Heated floor systems, app-controlled shower valves, pre-wired smart mirrors, automatic-flush toilets, recessed motion-sensor niches, and integrated audio. The wiring and rough-in for smart-bath features happen during framing and plumbing — adding it after the tile is set is expensive and rarely clean. We plan it in from the start of the design phase.

What waterproofing system do you use under the tile?

Schluter or RedGard membrane on every wet wall and shower floor. Pan slope is verified before tile goes down. Linear drains, point drains, and curbless showers all use the same waterproofing standard — we don't shortcut waterproofing by tier. The membrane is the single most important detail in a bathroom remodel because every other failure traces back to it.

Do you do walk-in showers and curbless showers?

Yes — both are standard. Curbless walk-in showers require sub-floor recessing or a build-up of the surrounding floor, which we plan for during demo. Linear drains, point drains, and trough drains are all in scope. We also build accessible showers with grab bars, fold-down benches, and ADA-compliant clearances.

Do you handle DOB permits for bathroom plumbing changes?

Yes. NYC's Department of Buildings requires a permit for plumbing relocations, fixture additions, and any work that changes the bathroom's footprint. We file under our license and manage the inspections. Cosmetic-only work in the same footprint (tile replacement, vanity swap, fixture replacement) usually doesn't require a permit — we'll tell you on the consultation which path your project falls under.

Can I bring my own tile, fixtures, or vanity?

Yes. If you've already sourced materials — a slab held at a yard, fixtures imported from overseas, a tile you've been holding for two years — we'll install them. We add a clarifying note to the contract about which warranties apply to homeowner-supplied materials. Some manufacturers void warranties on pieces not installed by an authorized installer; we flag those before you commit.

Free Consultation

Ready to start? Let’s talk.

Call to walk through your project, or schedule a free consultation — by video if you can’t be on site, in person if you can. We bring sample materials, a measuring kit, and a written scope back to you within a few business days.

Licensed Insured Bonded 10+ years

Mon–Sun · 8 AM–6 PM

(862) 430-3655